| 1. |
Visual
inspection of received plates |
|
|
| 2. |
removal
of old gasket |
|
|
| 3. |
Complete
non-abrasive cleaing |
|
|
| 4. |
Dye-penetrant
inspection for cracks and/or pin holes |
|
|
| 5. |
Removal
of dye-penetrant fluids |
|
|
| 6. |
If
needed, gasket and groove-area repair |
|
|
| 7. |
Gasket
and groove-cleaning to ensure proper bonding |
|
|
| 8. |
Plate
pack tightening |
|
|
| 9. |
Oven-cured
advesive bonding |
|
|
| 10. |
Final
inspection of every plate before shipping |
|
|